Engineers’ Day was celebrated on 15th September 2011 at the Engineers’ House, Ernakulam
Onam Celebrations were conducted on 04th September 2011 at N M Royal County, Tripunithura
300kV Gas Insulated Switchgear is shown in the figure. Hydraulic system is used for the operation of the Circuit Breaker (CB). Double bus bar arrangements with Isolators, CB etc. are included in the construction. It is a Transformer bay and hence the Gas Insulated Busbar (GIB) is shown. It is rated for 63kA for 3sec….
Installation of Penstock is shown in the figure. Wall thickness of the penstock increases at the bottom level, as the pressure is high. Concrete Anchor blocks and Rocker supports are shown in the photograph. Water from the dam will flow through the tunnel (wherever required) first, and then reaches Valve House. From Valve House, penstock…
300kV Oil filled Power Cable laying works from Substation to Gantry yard are shown in the figure. Trench is excavated and sand bed is provided for the laying of cables. Cable termination facility has been provided in the Gantry yard. Oil pressure in the cable will be maintained from Oil pressure tank. Single core cables…
AGB -2011 was held at Thiruvanathapuram on 12 June 2011 and the same was inaugurated by the Hon. Minister of State for Power, Govt. of India, Sri. K.C. Venugopal. National Seminar: VOLL & CUE (CASCADING IMPACT ON THE COUNTRY’S GROWTH TRAJECTORY)
Ernakulam unit organised District level seminar competition for the Special Seminar series III -2012 on topic: ‘SAVE ENERGY SAVE ENVIRONMENT’ – for Students of Engineering Colleges of Ernakulam District. 25th February 2011 at the seminar hall of Kerala State Productivity Council Hall, HMT Road, Kalamassery.The Programme was inaugurated by Er. K P Pradeep, Deputy Chief…