300kV Oil filled Power Cable laying works from Substation to Gantry yard are shown in the figure. Trench is excavated and sand bed is provided for the laying of cables. Cable termination facility has been provided in the Gantry yard. Oil pressure in the cable will be maintained from Oil pressure tank. Single core cables are used for EHV system.