Engineers House, TC 26/1300, Panavila, Thiruvananthapuram - 6950010471 2330696ksebea@gmail.com

Palakkad

Unit Activities

11-04-2013

Max. Demand 3045 mu Consumption 60.78 mu Shortage 5.43 mu Kerala Generation 27.57 mu Hydro 15.43 mu Drawal 33.21 mu Idukki Reservoir Details Level 704.34 m Eq.Energy 375.0 mu inflow 0.13 mu Idukki Generation 3.51 mu Last Year Level 709.67 m

07-04-2013

Max. Demand 2851 MW Consumption 56.30 mu Shortage 4.89 mu Kerala Generation 21.21 mu Hydro 8.83 mu Drawal 35.09 mu Idukki Reservoir Details Level 704.55 mu Eq.Energy 385mu inflow 0.36 mu Idukki Generation 1.68 mu Last Year Level 710.25 mu

05-04-2013

Max. Demand 2949 MW Consumption 60.52 mu Shortage 5.31 mu Kerala Generation 28.24 mu Hydro 14.77 mu Drawal 32.28 mu Idukki Reservoir Details Level 704.66 m Eq.Energy 390 mu inflow 076 mu Idukki Generation 3.29 mu Last Year Level 710.53 m

‘conserVE’ –Collegiate Project Design Competition –Final Round

‘conserVE’ , an inter collegiate project design competition organized by KSEBEA Alappuzha unit and Sree Buddha Engineering College , Pattoor for the engineering students concluded on 6.4.2013. The competition aims to encourage the budding engineers to apply their imagination, enthusiasm, critical thinking and creativity to technology innovations that can contribute to the nation building. The…

04-04-2013

Max. Demand 3046 MW Consumption 61.45 mu Shortage 4.72 mu Kerala Generation 30.82 mu Hydro 16.77 mu Drawal 30.63 mu Idukki Reservoir Details Level 704.74 m Eq.Energy 393.0 mu inflow 1.16 mu Idukki Generation 4.31 mu Last Year Level 710.86 m

31-03-2013

Max. Demand 2736 MW Consumption 55.99 mu Shortage 3.36 mu Kerala Generation 23.31 mu Hydro 16.90 mu Drawal 32.68 mu Idukki Reservoir Details Level 705.19 m Eq.Energy 413.0mu inflow 0.21 mu Idukki Generation 4.63 mu Last Year Level 711.54 m

Labha Prabha@ KSEB

Kerala State Electricity Board (KSEB) launched a comprehensive campaign that aims to improve demand-side management through an incentive scheme in order to ensure public participation. Labhaprabha, will run from March 23 to May 31. Labha Prabha involves two constituent schemes, of which one will focus on earning ‘energy credits’ and the other a ‘no load-shedding’…

28-03-2013

Max. Demand 2850 MW Consumption 58.76 mu Shortage 3.12 mu Kerala Generation 23.05 mu Hydro 16.70 mu Drawal 35.71 mu Idukki Reservoir Details Level 705.55 mu Eq.Energy 429.0 mu inflow 2.09 mu Idukki Generation 5.09 mu Last Year Level 712.10 m

25-03-2013

Max. Demand 2862 MW Consumption 57.67 mu Shortage 3.49 mu Kerala Generation 22.22 mu Hydro 16.12 mu Drawal 35.45 mu Idukki Reservoir Details Level 705.73 m Eq.Energy 438.0 mu inflow 0.54 mu Idukki Generation 3.49 mu Last Year Level 712.72 m

24-03-2013

Max. Demand 2795 MW Consumption 56.02 mu Shortage 3.11 mu Kerala Generation 18.99 mu Hydro 13.12 mu Drawal 37.08 mu Idukki Reservoir Details Level 705.78 m Eq.Energy 440.0 mu inflow 0.0 mu Idukki Generation 2.72 mu Last Year Level 712.97 m

Menu